top of page
Search
  • kempseyshowground

Covered Arena releveled and surfaces with additional drainage

To stop the constant flooding issues to the interior area of the covered arena, the team have installed additional drainage points to the side of the building and contractors have dropped the front open surface of the arena, removed all the excess dirt and sawdust and releveled.

This project has made possible from funding by Department of Industry - Showground Stimulus - Phase 1





10 views0 comments

Recent Posts

See All
bottom of page