top of page
Search

Covered Arena releveled and surfaces with additional drainage

  • kempseyshowground
  • May 31, 2020
  • 1 min read

To stop the constant flooding issues to the interior area of the covered arena, the team have installed additional drainage points to the side of the building and contractors have dropped the front open surface of the arena, removed all the excess dirt and sawdust and releveled.

This project has made possible from funding by Department of Industry - Showground Stimulus - Phase 1





 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

Office (02) 6562 5231

©2020 by Kempsey Showground. Proudly created with Wix.com

bottom of page